Sunday, January 6, 2013

The floor is in!

January 5th:

Plunger is a placeholder
for the toilet :)
The bathroom floor is in!
The compound on the nail heads holding the OSB down was sanded, the linoleum was cut and re-cut and re-cut to the exact size, the glue was poured and "combed", the linoleum was laid, the air bubbles were rolled out with - of all thing - a kitchen rolling pin  :)

Next steps...  Install toilet, hang doors (room and closet), and add trim/baseboard.

Then comes the best part - shopping for cabinets, sink, mirror, lights, towel rails etc.  But, for now, this is it.




No comments: