![]() |
| Plunger is a placeholder for the toilet :) |
The compound on the nail heads holding the OSB down was sanded, the linoleum was cut and re-cut and re-cut to the exact size, the glue was poured and "combed", the linoleum was laid, the air bubbles were rolled out with - of all thing - a kitchen rolling pin :)
Next steps... Install toilet, hang doors (room and closet), and add trim/baseboard.
Then comes the best part - shopping for cabinets, sink, mirror, lights, towel rails etc. But, for now, this is it.

No comments:
Post a Comment